2018.1

Table Of Contents
Comments Tab
The Comments tab is common to all tasks. It contains a text area (Task comments)that lets
you write comments about the task. These comments are saved when the dialog is closed with
the OKbutton, and are displayed in the Task Comments Pane.
Check the option Use as step description to display the text next to the icon of the plugin in
the Process area.
OL Connect tasks
OLConnect tasks are available in PlanetPress Workflow 8.0 and up. They are used
specifically to communicate with the Server component of PlanetPress Connect or
PReSConnect and for such purposes as creating record sets, generating contents and
generating output.
All In One
The All In One task is a combination of 4 different OLConnect tasks within a single one. This
makes creating Print content easier and faster, as the task is optimized for this specific purpose.
It exchanges less data with the server than the separate plugins do and it has multi-threading
support: it can produce the data set and content items in parallel.
The task is build with 3 tabs that represent the 3 main steps of the creation of a Print
Output:Data Mapping, Content Creation and Output Creation.
In a Print process built with separate plugins, the Job Creation task comes between Content
Creation and Output Creation. With the All In One, Job Creation is implied and equivalent to a
single created job; it isn't possible to use a Job Preset.
Tip
If you do need to use a Job Preset, set the All-In-One’s Output Creation options to None. Add the
Job Creation and Output Creation tasks to the process after the All-In-One.
This task can be added as an Action task (see "Action Tasks" on page254) or as an Output
task. Adding it as an Action task enables the process or branch to continue after this task. An
Output task is always located at the end of a process or branch.
Page 453