4 COMPONENTS INSTALLATION
General notes:
Select the required components from nVent product literature or
use the TraceCalc software.
nVent RAYCHEM component kits (including power connections,
splices and end seals) must be used to satisfy Standards and
Approval Body requirements.
Installation instructions included in the kit must be followed,
including those for preparation of the heating cable conductors
for connections. Before assembly, use the guide given in the
instructions to ensure that the kit is correct for the heating
cable and environment.
nVent RAYCHEM self-regulating and power limiting
heating cables are parallel circuit design. Do not twist the
conductors together as this will result in a short circuit.
4.1 Components required
For the installation of all components refer to the relevant
component installation instructions.
Required for each heating cable run:
Power connection and insulation entry kit
End seal.
As required:
Splice. Tee-splice. Junction box. Three connection kits and
three insulation entry kits. Accessories (pipe straps, fixing
tape, support brackets, labels, etc.).