Instruction Manual

nVent.com/RAYCHEM | 7
Make sure the bus
wires do not kink,
bunch, or crossover.
13
Push core sealer onto
the heating cable to
the mark made in step
6.
Note: Extra force may
be required for larger
cables or at lower
temperatures.
1/2 in
(13 mm)
1/2 in
(13 mm)
15
Trim bus wires and braid.
Repeat steps 12 through 15
for all heating cables.
14
Remove the guide tubes and
dispose of them in a plastic
bag.
Slip the green/yellow tube
onto the braid. Heat-shrinking
is not required.
16
Finished view of installed
core sealers.
Optional: Knock
out drain hole
if installed on
bottom of pipe.
11
Tubes
Make sure all strands
go into the tubes.
12
Slide strain relief
over heating cables,
down onto box nut.
Secure strain
relief by tightening
screws.
If needed, re-twist and straighten bus wires,
then insert bus wires into guide tubes as shown.
CAUTION: Health Hazard.
Wash hands after contact with sealant. Consult material
safety data sheet VEN 0058.
Avertissement: risque pour la santé. Se laver les mains
après tout contact avec le produit d’étanchéité.
Consulter la fiche de données de sécurité VEN 0058.