Instruction Manual

nVent.com/RAYCHEM | 5
1/4 in
(5 mm)
6 1/2 in
(165 mm)
BTV, QTVR
6 1/2 inches
(165 mm)
180°
180°
6 1/2 inches
(165 mm)
HTV
5C 5D
Push braid back to create
a pucker.
At pucker use a
screwdriver to open
braid.
Bend heating cable and
work it through opening in
braid.
Lightly score inner jacket
around and down as
shown.
Peel off inner jacket.
Notch core.
Peel bus wire
from core.
Score core between bus
wires at inner jacket.
Bend and snap core.
Peel core from bus wire.
Remove any remaining
core material from bus wires.
Pull braid tight to make pigtail.
Go to Step 6 Go to Step 6
Push braid back
to create
a pucker.
At pucker use
a screwdriver
to open braid.
Bend heating
cable and work it
through opening
in braid.
Score inner jacket
and conductive
core around and
down as shown.
Peel off
inner jacket.
Flip the cable
180ºC and score
the other side of
inner jacket and
conductive core.
Remove the inner
jacket, conductive
core by using
needle-nose pliers
as shown.
Remove any remaining
material from bus wires.
Pull braid tight to
make pigtail.
Score and remove
center insulation.