Installation Manual

4 / 4THERMAL MANAGEMENT SOLUTIONS
EN-RaychemIceStopClipsbrackets-IM-H5669003/13
WWW.THERMAL.PENTAIR.COM
© 1999-2013 Pentair.
NORTH AMERICA
Tel: +1.800.545.6258
Fax: +1.800.527.5703
Tel: +1.650.216.1526
Fax: +1.650.474.7711
thermal.info@pentair.com
EuROPE, MIddLE EAsT, AfRICA
Tel: +32.16.213.511
Fax: +32.16.213.603
thermal.info@pentair.com
AsIA PACIfIC
Tel: +86.21.2412.1688
Fax: +86.21.5426.2917
cn.thermal.info@pentair.com
LATIN AMERICA
Tel: +55.11.2588.1400
Fax: +55.11.2588.1410
thermal.info@pentair.com
Pentair and IceStop are owned by Pentair or its global affiliates. All other trademarks are the property of their respective owners. Pentair reserves the
right to change specifications without prior notice.
GM-RAKE
Wide
orientation
Narrow
orientation
1
3A
4
GM-RAKE
2
3B
• BendtheGM-RAKEto
approximately 90°
• Insertcabletiesthrough
holes on the GM-RAKE
• TheGM-RAKEshould
be centered on the
edge of the downspout
to prevent mechanical
damage and to support
the heating cable
• UsetheGM-RAKEto
protect the heating cable
from sharp edges
The GM-RAKE can also
be used in one of two
orientations in a wide
gutter as a spacer
• PositiontheGM-RAKEand
tighten the cable ties
• Trimoffexcesscabletie
Installing H915 in Downspout Installing H915 for Mechanical Protection