INSTALLATION: DIRECT METHOD
2.61 FLOOR PREPARATION: DIRECT METHOD
Tile/Stone installations only.
1. Prepare the thinset mortar as per manufacturer’s instructions.
2. Use a minimum
3
/
8” x
3
/
8”square-notchedtroweltospreadathinlayerofthinset
mortar over the Cable ( following the same direction as the cable ).
Conduct insulation and resistance tests and record the resistance
reading on page 7.
3. Toensureeachtilehasadequateadherencetothesuboor,applyalayerof
thinset mortar to the backside of the tile (back-buttering). Lay the tile directly
onthethinsetmortarandrmlypressdownonthetile.Thistechniquehasa
highlevelofdifcultyandisnotrecommendedforinexperiencedtileinstallers.
Before activating Nuheat, allow setting material (self-
leveling / thinset mortar compound and grout) to cure according
to manufacturer’s instructions (usually 72 hours to one week).
FIGURE 2.62: Direct method
!
!
!