Cut Sheet

WCABLE TO RAIL AND STRUCTURES
FACTORY MADE
CABLE JOINT STUB END WEB WELDER MOLD ONLY WELD
SIZE BOND BOND PART NUMBER PART NUMBER METAL
1/0 W12C-(length) W32C-(length) WRS-2C-RH (-LH) WRS-2C-RHM (-LHM) 65F80
2/0 W12G-(length) W32G-(length) WRS-2G-RH (-LH) WRS-2G-RHM (-LHM) 90F80
4/0 W12Q-(length) W32Q-(length) WRS-2Q-RH (-LH) WRS-2Q-RHM (-LHM) 90F80
FIELD MADE
CABLE WEB WELDER MOLD ONLY HAMMER WELD
SIZE PART NUMBER PART NUMBER SLEEVE DIE METAL
1/0 WRS-05-RH (-LH) WRS-05-RHM (-LHM) S05F WD80 65F80
2/0 WRS-03-RH (-LH) WRS-03-RHM (-LHM) S03F WD84 90F80
4/0 WRS-01-RH (-LH) WRS-01-RHM (-LHM) S01F WD82 90F80
REQUIRED TOOLS
SUGGESTED TOOLS
ACCESSORIES
CABLE TO RAIL AND STRUCTURES
•Type W Bonds are for bonding and grounding of standard
rails. These bonds are welded to the web of rail sections
85 lb. to 140 lb.
Mold frame includes adjusting screw to position bond at
neutral axis of rail where stresses are minimal.
Contact ERICO for crane and girder rails.
Concentric stranded copper cable is listed.
NOTE: Rail materials characteristics, use and location of
weld should be considered when selecting connections
to a rail.
Cable Cleaning Brush T313
Slag Removal Spade B136A or B136B
Mold Cleaning Brush T394
Rasp T321
Torch Head T111
See Section A
Flint Ignitor T320
(Included with welder
but also available separately)
W
Type W - RH Shown
WEB WELDER
HOW TO ORDER FACTORY MADE BONDS
1. Order bond giving bond length in inches.
a. Joint bonds must be at least 10 inches longer
than rail angle bar.
b. Stub-End bonds must be 9 inches minimum.
Specify right hand (RH) or left hand (LH).
2. Order welder (mold with frame and rail clamp) by
right hand and/or left hand. Includes flint ignitor.
3. Replacement molds and weld metal are furnished
with bonds as follows:
Joint bonds: Two weld metals per bond, plus one
each right and left hand mold for every 80 bonds.
Stub-End bonds: One weld metal per bond, plus one mold only for every 80 bonds.
HOW TO ORDER FIELD MADE
BONDS
1. One sleeve per cable end to
be welded to rail.
2. One or more hammer die per
job.
3. One welder for each welding
crew. Right hand and/or left
hand.
4. One mold for every 50 to 80
bonds after first 50. Right hand
and/or left hand.
5. One weld metal per cable end
to be welded.
Sleeve
Hammer Die
9-3