Installation Sheet
customer service 1-800-43-SATCO
2
www.satco.com
3
STEP 1: Turn-off /disconnect power at circuit braker.
STEP 2: Install 2 long screws (provided) to Jbox leaving
minimum 1/2" space to ceiling.
STEP 3: Make Ground connection. Attach black AC
wire form fixture to black AC wire from Jbox.
Connect white wire form fixture to white wire from Jbox.
STEP 4: Align the holes on the base of the fixture with
the pre-installed screws from the Jbox using the proper
slots as indicated in the above diagram.
STEP 5: To attach cover plate, align pins on side of
square cover with the slot of base and push cover
locks into place.
STEP 6: Fixture installed.