Installation Guide

nuvoiron.com
1.866.955.0355
info@nuvoiron.com
#NuvoIron for a chance to be featured on our social media pages!
@
nuvoironfencing
@
nuvoiron
@
nuvoiron
@
nuvoiron
INSTALLATION INSTRUCTIONS
WPCP4B
4" x 4" Wood Post Connector Plate
For securing and stabilizing a nominal wood 4” x 4” post to a wood surface.
DO NOT USE ON A FENCE OR STRUCTURE OVER 60" IN HEIGHT OR ON A DECK MORE THAN 24" OFF THE GROUND.
Ensure you purchase the appropriate fasteners for your project (not included) and ones that are suitable to the
materials you are working with or installing on.
For more information, consult with the fastener manufacturer.
1. Measure your post and cut to the desired length.
Place your plate at the bottom of the post and mark and drill 11/64" pilot holes.
2. Attach the plate to the post (with the raised side to the post) using #14 screws,
minimum of 3 1/2" long or longer (not included).
Ensure the fasteners you are using are appropriate for your materials
and project type.
3. To begin surface installation, mark and drill 11/64" pilot holes.
Secure the plate to the surface using #14 screws, minimum 3 ½" long or longer
(not included).
Ensure it's fully embedded in the same thickness of the material.
Ensure the fasteners you are using are appropriate for your materials
and project type.
IMPORTANT:
Please Note: before building a permanent structure, it is important to take into consideration where you live and your typical exposure to the seasonal elements as product
performance may change accordingly. This includes, but is not limited to, rain, wind, snow, ice, sunlight, ooding, earthquakes and intense heat. Wearing personal
protective equipment; safety glasses, etc., and using suitable fasteners for your application are equally as important in ensuring your installation goes smoothly and safely.
Additionally, load calculations are unavailable. Prior to construction, check with your local municipality for building code requirements in your area (consulting local
building codes is required when supporting permanent structures).
For certain structures, we recommend consulting a professional to ensure that these products are appropriate for your intended application and that the structural
components for which these products are to be used in connection with are sound.
In no event shall Nuvo Iron
be liable for any consequential, special, or incidental changes arising out of breach of local, municipal, country, state, provincial, and federal
building codes or any other type of laws or bylaws. Furthermore, Nuvo Iron
shall not be held liable for any loss or damage resulting from improper use.
Nuvo Iron
, its advertising agency and delegates have made every effort to ensure the accuracy of all measurements and other details in these instructions and we
anticipate no problems to arise. However, we cannot be responsible for errors beyond that effort. Therefore, always double-check details before beginning your project.
Nuvo Iron
, its advertising agency and delegates shall not be held responsible for injury, damage or any other loss, however caused, resulting from the information
contained in these instructions.

Summary of content (2 pages)