Installation Guide
XN110H Installation Guide
Page 5
3
4
1
2
New Construction Installation
5
Connect Wires and Install Knockout Plate
• Run 120VAC electrical wiring to the installation location.
• Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag.
• Connect wires as shown in wiring diagram.
Screw from
Parts Bag
Attach cable clamp to Knockout
Plate. Knockout Plate mounts to
outside of Housing and may be
oriented as desired.
Connect wires
FAN
SENSOR/
CONTROL
BLK
WHT
BRN
SENSOR/
CONTROL
MANUAL-ON
GRD
WHT
BLK
GRD
WHT
BLK
120 VAC
LINE IN
STANDARD OR MULTI-
FUNCTION WALL SWITCHES
RED
BLK
RED
ORG
14/3
(IF ALL
WALL SWITCH
OPTIONS
ARE USED)
MANUAL
ON
SWITCH*
KNOCKOUT
PLATE
RECEPTACLES
120 VAC
LINE IN
SWITCH BOX
BLACK
WHITE
RED
BROWN
*
purchase separately
SENSOR
CONTROL
SWITCH*
GROUND
(green or bare)
ORANGE
• See OPERATION section on page 12
for details.
• SENSOR/CONTROL switch turns
humidity control on for automatic
operation and off for fan cleaning and
maintenance purposes.
• MANUAL-ON switch directly turns fan
on/off.
• MANUAL-ON switch is not required to
manually turn fan on (see page 10).
• SENSOR/CONTROL switch may be
located where it is not easily accessed
for everyday usage; it may need to
be labeled and located where it can’t
be turned on without being seen from
fan to comply with local and national
codes.