Warranty
6
9. DUCT CONNECTION
VERTICALLY DUCTED INSTALLATION:
Plug hood power cord into the outlet. Slide a 6” round metal duct section over the
adapter/damper on the hood. Use metal foil duct tape to seal the joint.
HJ0157
HORIZONTALLY DUCTED INSTALLATION:
Plug hood power cord into the outlet. Measure and install 6” round metal ductwork to wall
cap and 90° elbow over duct collar over the adapter/damper on the hood. Use metal foil
duct tape to seal the joints.
HJ0159
14¼”
MAX.
LOWER FLUE
MOUNTING
BRACKET
HD1033A
NOTE: To make sure there will be adequate clearance between top of hood and lower
flue mounting bracket for ductwork, elbow must be located below the lower flue
mounting bracket.