2.0
Table Of Contents
- Introduction
- Installation and Setup
- Tutorials
- Views and Form Usage
- OmniForm Procedures
- Designing a Form
- The Design Process
- The Design View Toolbars
- Creating Objects
- General Creation Guidelines
- Creating a Text Object
- Creating a Line Object
- Creating an Oval Object
- Creating a Rectangle Object
- Creating a Graphic Object
- Creating a Fill Text Object
- Creating a Comb Object
- Creating a Check Box Object
- Creating a Circle Text Object
- Creating a Table Object
- Creating a Fill Graphic Object
- Defining Objects
- Changing Object Appearance
- Redesigning Your Form
- Using the Scrapbook
- Inserting OLE Objects in a Form
- Filling a Form
- Managing an OmniForm Database
- Using Calculations
- Calculation Overview
- Operators
- Functions
- Abs (Absolute Value)
- Avg (Average)
- Date (Current Date)
- DayName
- DayOfMonth
- DayOfWeek
- DayOfYear
- Exp (Exponentiation)
- FV (Future Value)
- Hour
- If
- Int (Integer)
- Left
- Length
- Ln (Natural Logarithm)
- Log (Base 10 Logarithm)
- Lower
- Max (Maximum)
- Middle
- Min (Minimum)
- Minute
- Mod (Modulus (Remainder))
- Month
- MonthName
- Pi
- PMT (Payment)
- Position
- Proper
- PV (Present Value)
- RecordCount
- Replace
- Replicate
- Right
- Round
- Second
- Sign
- Sqrt (Square Root)
- Sum
- Time
- Trim
- Trunc (Truncate)
- Upper
- Year
- Functions — Quick Reference
- Functions Sorted by Type
- Technical Information
- Glossary
Tutorial 3 — Design Your Own Form
Tutorials - 62
• You can enter dates in the right column as either January 1,
1995 or 1-1-95 and they will be converted to the m/d/yy
format. Or, you can enter them as 1/1/95 in the first place.
9 Verify that comb field elements contain the right amount of
numbers.
10 Enter numbers in the calculation fields.
The Expenses and Profit fields should fill automatically and
correctly as you fill in the other fields involved in the
calculation.
Return to design view to make any changes you need. Save this form.
You will use it in the next tutorial.