Phau Ntawv Qhia

Charge on.
Page 8 o f 3 7 Blink IQ 2 0 0
Level 2 AC EVSE Instruction Manual 1 0 / 9 / 2 0 1 9
5 . PRE-IN STALLATIO N IN STRUCTIO N S
5 .1 . Sa fety a nd Grounding
5 .1 .1 . Sa fety Check
CAUTIO N : DISCO N N ECT ELECTRICAL PO W ER PRIO R TO IN STALLIN G THE BLIN K
CHARG IN G STATIO N . FAILURE TO DO SO MAY CAUSE PHYSICAL IN JURY O R DAMAG E
TO THE ELECTRICAL SYSTEM AN D BLIN K PRO DUCT.
The Blink Pro duct should be installed o nly by a licensed co ntracto r, and/ or a licensed
electrician in acco rdance with all applicable state, lo cal and natio nal electrical co des and
standards.
Before installing the Blink Pro duct, review this manual carefully and co nsult with a licensed
co ntracto r, licensed electrician and trained installatio n expert to ensure co mpliance with lo cal
building practices, climate co nditions, safety standards, and state and lo cal co des.
Use appropriate pro tectio n when co nnecting to the main po wer distributio n cable. Use to o ls
5 .1 .2 . Grounding Instructions
This product must be co nnected to a g ro unded, metal, permanent wiring system; and an
equipment gro unding co nducto r must be run with the circuit co nducto rs and co nnected to the
equipment g ro unding terminal o r lead o n the pro duct.