User manual
187
System Settings
Scheduling - Getting Started
After starting the scheduled measurement, the XL2 waits for
the next scheduled start date and time. The instrument buttons
are disabled.
Power Supply
It is recommended that the instrument remains powered on
until the next start time, using the accessory mains power
adapter. If the XL2 is powered off and on again during this time,
then the XL2 Analyzer restarts in the Scheduler function and
continues the countdown. This applies also for any interruption
of mains power supply.
Stopping the Scheduler
Press and hold the start/stop button
to stop the scheduler
prior to the start of the measurement or as an interrupt of any
ongoing scheduled measurement.
Operation with PC
Starting the schedule switches the USB interface automatically
into the COM port mode for remote measurement applications
or using the XL2 Projector PRO software.
Options
Displays the options installed on the XL2.
Every installed option may be temporarily Hidden to generate
a profile for other XL2s without this option installed.
Select the installed option.•
Toggle with enter •
to set this parameter.










