User Manual
Reversible Vibratory Plate Operation Manual
page 25 issued 03/2016
7. MAINTENANCE SCHEDULE
This maintenance schedule contains only the most important operations. Besides of the mentioned operation, carry out maintenance and repairs according to
the operational conditions of the machine, as well as those mentioned in the Operation Manual to the engine.
WARNING:
Place the machine on a lever surface, lift the tipping-off cover and shut down engine prior to any maintenance operations.
Use genuine spare parts only. Use of non-original spare parts may lead to damage to the machine. The manufacturer will not honour any warranty
claim arising from such reason.
Maintenance schedule for engines HONDA GX
Item
Operation
Initial inspection
After the first month
or 20 hrs of operation
Every 3 months
or 50 hrs of operation
Every 6 months
or 100 hrs of
operation
Engine oil
Inspection - oil level
DAILY
Replacement
Air filter
Inspection
DAILY
Cleaning
(1)
Spark plug
Inspection - cleaning
Fuel hose
Inspection (replacement)
Every two years (2)
Valve clearance
Inspection - adjustment
Every year or 250 hours of operation (2)
Fuel tank and sieve
Cleaning
Every year or 300 hours of operation (2)
Sediment bowl
Cleaning
Vibrator
Adjustment of frequency
Oil replacement
Every year or 300 hours of operation (2)
Rubber mounts
Inspection for intactness
150 hours of operation
Hydraulic oil
Inspection for leaking
Every year or 300 hours of operation (2)
Drive belt
Inspection of tensioning,
inspection of pulleys and clutch
(2)
1. To be carried more often when operating in dusty environment!!!
2. These operations should be carried out by NTC service technician, or by authorized service for the given type of engine; especially when the
user does not have the adequate tools and knowledge of this kind of equipment.










