Product Manual
9
4. Surveying preparation
4.1 Setting up the instrument
(1)Setting up the tripod
Adjust the tripod legs so that a height
suitable for surveying is gained. Tighten the
lock screws.
(2)Setting up instrument on the tripod
Put the instrument on the head and attach it
to the base plate by the center screw.
4.2 Leveling the instrument
(1)Leveling with the bubble
By adjusting leveling screws A and B,
position the bubble in the center of
vial(Fig.9).
Screw A
Screw B
Screw C
Screw A
Screw B
Screw B
Fig. 9
Fig. 10