Product Manual
13
Assembly
Step 2a – Tow Bar Assembly – 282780 Only
• Align tow bar assembly with cart assembly as shown below.
• Insert bolts and secure with nuts. Torque to 20 Ft.-Lbs.
Tools Needed
• 1/2” wrench
• Torque wrench
Fasteners Needed from Owner’s Manual Bag:
5/16” x 2” Bolt
Qty 3
82018
5/16” Nut
Qty 3
82019