Product Manual

Assembly
11
5/16 x 3/4” carriage bolt (4)
5/16 flange nut (4)
Tee handle knob (2)
Reinforcement plate
Vertical
boom mount
Horizontal boom mount
5/16 x 1” carriage bolt (2)
Upper mounting
holes
Lower mounting
holes
Sprayer frame
Nozzle nut (2)
Nozzle adapter (2)
Left broadcast nozzle
1870PSL
Right broadcast
nozzle 1870PSR
Nozzle bracket
Nozzle hose
barb elbow
Screw at top
of nozzle
Step Five: Build nozzle bracket assembly
1. Position the nozzle bracket as shown.
2. Secure nozzle hose barb elbows to nozzle bracket with
nozzle nuts. Hose barbs should point down.
3. Thread nozzle adapters onto nozzle hose barb elbows.
4. Thread on left (purple) and right
(orange) broadcast nozzles. The
nozzle is correctly positioned when
the screw on the face of each
broadcast nozzle is at the top.
Step Six: Install boom mounts
1. Use the reinforcement plate and fasten horizontal boom mount to sprayer frame with (2) 5/16
x 1” carriage bolts and (2) tee handle knobs. The horizontal boom mount position is
adjustable. Slide it forward or back to best suit the sprayer installation
2. Install the vertical boom mount to the horizontal boom mount with (4) 5/16 x 3/4” carriage
bolts and (4) 5/16 flange nuts.
a. If the sprayer will be mounted in a pickup, use
the upper mounting holes on the vertical boom
mount.
b. If the sprayer will be used with our trailer kit
268175, use the lower mounting holes on the
vertical boom mount.