User manual

Table Of Contents
Page 456 of 458 Index
NN43021-310 Standard 02.02 October 2008
positioning
earthquake bracing, 359
equipment, 71
positioning guides
fourth modules, 66
module additions, 374, 380
power cables
fourth modules, 68
module additions, 370, 371, 373, 381, 382
power cords, 82
power systems, 59, 93
power-up
preparations, 301
PWR messages in acceptance tests
module power supply, 338
R
ramps, 58
receptacles, 77
ringing generators
acceptance tests, 338
rod installation
earthquake bracing, 353, 357
RS-232 cable
modem cabling, 181, 183
S
safety ground/protective earth
AC power, 78, 82
DC power, 109, 123
SDI (serial data interface) ports
modem connections, 179, 181, 183, 185, 186
system monitor interface, 153, 158
system terminal connections, 171
seismic anchor kits, 347, 348
seismic bracing kits, 347
Signaling Server, 45
single-column systems
bracing rod installation, 357
ground and logic return distribution, 79, 83,
123
system monitor option switches, 153
single-row systems
superloop cabling, 254, 257
slave switch settings
system monitor, 154
spacers and spacer kits, 40
bracing rod installation, 358, 359
multiple-column systems, 72
SPG (single-point ground), 78
split mode monitoring, 172, 173
static discharge, 59
superloop adapter plates, 258
superloop cabling, 254
switch boxes
modem connections, 183, 185, 186
system terminal connections, 175, 177
sysloads
acceptance tests, 341
System 600/48 Power Plant
PDU connections, 125
system installation procedures, 33
system monitors
acceptance tests, 342
cabling, 157
configuring, 151
for DC power, 121
fourth modules, 68
module additions, 367, 370, 371, 372, 373,
376, 381, 382
system monitors, cabling, 151, 157
system terminals, 171
acceptance tests, 342
connections, 172
CPIO port connections, 174, 175, 177