User manual
Table Of Contents
- Title page
- New in this release
- List of Procedures
- How to get help
- Finding the latest updates on the Nortel web site
- System information
- Introduction
- Preparing for installation
- Placing the fourth module on a column
- Positioning and leveling equipment
- Installing AC power
- Installing overhead cable tray kits
- Installing DC power
- Contents
- DC-powered systems
- Candeo DC power systems
- Large Candeo modules
- Small Candeo modules
- Installation reference guide
- Configuration reference guide
- Safety ground/protective earth and logic return wiring
- Cabling and connecting the grounding leads
- Connecting the power plant frame ground (or safety ground) leads
- Four-Feed PDU
- Installing the Four-Feed PDU
- Installing safety ground/protective earth wiring
- Connecting power from the power plant to the PDU
- Connecting UK power to the Four-Feed PDU
- System monitor connections
- Planning and designating a Main Distribution Frame
- Installing Power Failure Transfer Units
- Configuring the system monitor
- Connecting a system terminal or modem
- Contents
- About the system terminal
- Connecting a terminal
- Connecting a terminal to a COM port
- Connecting a switch box and terminal to COM1 and COM2 ports
- Connecting a switch box and terminal to SDI and COM1 ports
- Connecting a modem
- Configuring a modem
- Connecting a modem to an SDI port
- Connecting a modem to switch box, COM2 ports, SDI ports
- Cabling Common Equipment in a Single Group system
- Contents
- Cabling guidelines
- Core/Net module
- Cabling the Core side
- Cabling the I/O panel
- Cabling the Network side
- Configuring and cabling the Clock Controllers
- Network Group 0: Shelf 0 to Shelf 1
- Connecting the 3PE faceplates in the Core/Net modules
- Inspecting CNI to 3PE factory installed cables
- Connecting the Core/Net backplanes
- Optioning the System Utility Card
- Connecting Core modules to a LAN
- Cabling Common Equipment in a Multi Group system
- Contents
- Cabling guidelines
- Core/Net module
- Cabling the Core/Net module backplane
- Disconnecting cables from the Core/Net module backplane
- Optioning the System Utility Card
- Core shelf cabling
- Installing the CP PIV to I/O panel cables
- Connecting the Core module to a LAN
- Cabling a Dual Ring Fiber Network
- FIJI card cabling
- Installing the Shelf 0 fiber optic ring (ascending)
- Installing the Shelf 1 fiber optic ring (descending)
- FIJI to FIJI cabling
- Connecting the Clock Controller cables
- Cabling network modules and loops
- Contents
- Network-to-network cabling
- Network module connections
- Network Group 0: Shelf 0 to Shelf 1
- Connecting the 3PE faceplates in the Core/Net modules
- Connecting the Core/Net backplanes
- Connecting Groups 1 through 7: Shelf 0 to Shelf 1
- Connecting the Network modules to the Core/Net modules
- Connecting the 3PE cables to the 3PE fanout panels
- Cabling a Superloop Network Card - single column
- Cabling a Superloop Network Card - multiple columns
- Cabling lines and trunks
- Powering up the system and initial loading
- Performing acceptance tests
- Installing earthquake bracing
- Adding a module to a column
- Installing a Signaling Server
- Contents
- Introduction
- Readiness checklist
- Installing the CP PM Signaling Server hardware
- Connections
- Installing the Signaling Server software
- First boot of a new Nortel CP PM Signaling Server
- Unpacking Help files for Virtual Terminal Emulator
- Logging in to the Signaling Server
- Verifying a successful configuration
- Testing the Leader Signaling Server
- Index

Index Page 455 of 458
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
NT8D37 IPE Modules
backplane slots, 138
cable connections, 264, 267
line pair-termination tables, 268
superloop cabling, 254, 258
trunk pair-termination tables, 268, 271
NT8D46AD cable, 159
NT8D46AJ cable, 163
NT8D46AL cable, 160
NT8D46AP cable, 160
NT8D46AQ cable, 163
NT8D46AS cable, 159
NT8D46AU cable, 163
NT8D46AV cable, 164, 165
NT8D46BH cable, 162
NT8D46BV cable, 164
NT8D46 cable, 182, 183
NT8D46CV cable, 164
NT8D46DH cable, 162
NT8D46EH cable, 162
NT8D49AA Spacer Kits, 358, 359
NT8D49 Spacer Kits, 72
NT8D52 Blower Units, 339
NT8D63 Overhead Cable Tray Kits, 89
NT8D64BD seismic bracing kits, 347
NT8D64BE seismic anchor kits, 348
NT8D64CA seismic bracing kits, 347
NT8D64CB seismic bracing kits, 347
NT8D64CC seismic bracing kits, 347
NT8D64CD seismic bracing kits, 347
NT8D64CE seismic bracing kits, 348
NT8D84 cable, 184
NT8D88AD cable, 259
NT8D91 cable, 255
NT8D92 cable, 259
NT8D95 cable
modem cabling, 182, 184
system terminal cabling, 174, 175, 177
NT8D98 cable, 259
NT9D19 Call Processing Card, 172
O
option 21A, 77
option 61
system terminals, 172
option 71
system terminals, 172
option switches
system monitor, 153
Overhead Cable Tray Kits, 89
OVL messages, 342
P
P069985 Top Cap Cable Egress Panel, 89
pair-termination tables, 268
PDU (power distribution unit), 94
equipment layout, 121
power to, 125
safety ground, 122
system monitor cabling, 157
PE (Peripheral Equipment)
trunk pair-termination tables, 269
PE (Peripheral Equipment) modules
line pair-termination tables, 269
pedestals, 38
grills, 63
module additions, 367, 368
power, 118
PFTU (power fail transfer unit), 145
acceptance tests, 343
alarm connections, 146
system monitor cabling, 161
trunk and telephone connections, 149










