Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Table 2
List of tasks in subsections
Task Go to page
Preparing for installation 37
Placing the fourth module on a column 65
Positioning and leveling equipment 71
Installing overhead cable tray kits 89
Installing AC power 77
Installing DC power 93
Planning and designating a Main Distribution Frame 133
Installing Power Failure Transfer Units 145
Configuring the system monitor 151
Connecting a system terminal or modem 171
Cabling Common Equipment in a Single
Group system
187
Cabling Common Equipment in a Multi Group system 207
Cabling network modules and loops 241
Cabling lines and trunks 263
Powering up the system and initial loading 301
Performing acceptance tests 337
Installing earthquake bracing 345
Adding a module to a column 365