Performing acceptance tests
Contents
This section contains information on the following topics:
Acceptance tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 337
Testing the module power supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 338
Testing the blower unit and thermal sensor . . . . . . . . . . . . . . . . . . . . . 339
Testing the sysload . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 341
Testing the system terminal and system monitor . . . . . . . . . . . . . . . . . 342
Testing the PFTU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 343
Acceptance tests
Perform the following acceptance tests after the system loading is completed.
1 “Testing the module power supply” on page 338
2 “Testing the blower unit and thermal sensor” on page 339
3 “Testing the sysload” on page 341
4 “Testing the system terminal and system monitor” on page 342
5 “Testing the PFTU” on page 343
CAUTION
Ensure that the current DEP Lists are installed.