User manual

Table Of Contents
Page 336 of 458 Powering up the system and initial loading
NN43021-310 Standard 02.02 October 2008
6 Clear the display and minor alarms on both Cores:
7 Test the clocks:
a. Verify that the clock controller is assigned to the active Core:
8 Verify that the Clock Controllers are switching correctly:
9 Check applications (CallPilot, Symposium, Meridian Mail, and so on.).
10 Check dial tone.
End of Procedure
STAT XSM Check the system monitors
**** Exit program
LD 135 Load program
CDSP Clear displays on the cores
CMAJ Clear major alarms
CMIN ALL Clear minor alarms
LD 60 Load program
SSCK x Get status of the clock controllers (x is “0” or “1”
for Clock 0 or Clock 1)
SWCK Switch the Clock (if necessary)
**** Exit program
SWCK Switch Clock
(Wait 30 seconds)
SWCK Switch Clock again