User manual

Table Of Contents
Cabling Common Equipment in a Multi Group system Page 225 of 458
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
(Figure 94 on page 225). Four steps are required to configure the Fiber
Network:
“Installing the Shelf 0 fiber optic ring (ascending)” on page 232.
“Installing the Shelf 1 fiber optic ring (descending)” on page 233.
“FIJI to FIJI cabling” on page 235.
“Connecting the Clock Controller cables” on page 236.
Figure 94
Dual Ring Fiber Network
553-9143
Tx (J1)
Rx (J2)
J3
J4
Tx (J1)
Rx (J2)
J3
J4
Tx (J1)
Rx (J2)
J3
J4
Tx (J1)
Rx (J2)
J3
J4
Tx (J1)
Rx (J2)
J3
J4
Tx (J1)
Rx (J2)
J3
J4
Tx (J1)
Rx (J2)
J3
J4
Group 0, shelf 1
Group 0, shelf 0
Group 1, shelf 0
Group 1, shelf 1
Group 2, shelf 1
Tx (J1)
Rx (J2)
J3
J4
Group 3, shelf 0
Group 3, shelf 1
NTRC48xx fiber optic cables
Group 2, shelf 0