User manual
Table Of Contents
- Title page
- New in this release
- List of Procedures
- How to get help
- Finding the latest updates on the Nortel web site
- System information
- Introduction
- Preparing for installation
- Placing the fourth module on a column
- Positioning and leveling equipment
- Installing AC power
- Installing overhead cable tray kits
- Installing DC power
- Contents
- DC-powered systems
- Candeo DC power systems
- Large Candeo modules
- Small Candeo modules
- Installation reference guide
- Configuration reference guide
- Safety ground/protective earth and logic return wiring
- Cabling and connecting the grounding leads
- Connecting the power plant frame ground (or safety ground) leads
- Four-Feed PDU
- Installing the Four-Feed PDU
- Installing safety ground/protective earth wiring
- Connecting power from the power plant to the PDU
- Connecting UK power to the Four-Feed PDU
- System monitor connections
- Planning and designating a Main Distribution Frame
- Installing Power Failure Transfer Units
- Configuring the system monitor
- Connecting a system terminal or modem
- Contents
- About the system terminal
- Connecting a terminal
- Connecting a terminal to a COM port
- Connecting a switch box and terminal to COM1 and COM2 ports
- Connecting a switch box and terminal to SDI and COM1 ports
- Connecting a modem
- Configuring a modem
- Connecting a modem to an SDI port
- Connecting a modem to switch box, COM2 ports, SDI ports
- Cabling Common Equipment in a Single Group system
- Contents
- Cabling guidelines
- Core/Net module
- Cabling the Core side
- Cabling the I/O panel
- Cabling the Network side
- Configuring and cabling the Clock Controllers
- Network Group 0: Shelf 0 to Shelf 1
- Connecting the 3PE faceplates in the Core/Net modules
- Inspecting CNI to 3PE factory installed cables
- Connecting the Core/Net backplanes
- Optioning the System Utility Card
- Connecting Core modules to a LAN
- Cabling Common Equipment in a Multi Group system
- Contents
- Cabling guidelines
- Core/Net module
- Cabling the Core/Net module backplane
- Disconnecting cables from the Core/Net module backplane
- Optioning the System Utility Card
- Core shelf cabling
- Installing the CP PIV to I/O panel cables
- Connecting the Core module to a LAN
- Cabling a Dual Ring Fiber Network
- FIJI card cabling
- Installing the Shelf 0 fiber optic ring (ascending)
- Installing the Shelf 1 fiber optic ring (descending)
- FIJI to FIJI cabling
- Connecting the Clock Controller cables
- Cabling network modules and loops
- Contents
- Network-to-network cabling
- Network module connections
- Network Group 0: Shelf 0 to Shelf 1
- Connecting the 3PE faceplates in the Core/Net modules
- Connecting the Core/Net backplanes
- Connecting Groups 1 through 7: Shelf 0 to Shelf 1
- Connecting the Network modules to the Core/Net modules
- Connecting the 3PE cables to the 3PE fanout panels
- Cabling a Superloop Network Card - single column
- Cabling a Superloop Network Card - multiple columns
- Cabling lines and trunks
- Powering up the system and initial loading
- Performing acceptance tests
- Installing earthquake bracing
- Adding a module to a column
- Installing a Signaling Server
- Contents
- Introduction
- Readiness checklist
- Installing the CP PM Signaling Server hardware
- Connections
- Installing the Signaling Server software
- First boot of a new Nortel CP PM Signaling Server
- Unpacking Help files for Virtual Terminal Emulator
- Logging in to the Signaling Server
- Verifying a successful configuration
- Testing the Leader Signaling Server
- Index

Installing DC power Page 103 of 458
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
• remote or local access (PSTN, GSM, EEM, TCP/IP, SNMP)
• local and remote Graphical User Interface (GUI) with multi-language
compatibility
Distribution 300 panel
The Candeo SP48300 can have either one or two distribution panels. Each
distribution panel can support 300 A. The panels are used to connect small
and medium capacity distribution loads. They can accommodate a wide
variety of distribution hardware in various configurations.
The initial distribution panel supports 18 load feeds and 8 battery feeds,
together with Battery Low Voltage Detection (BLVD). The supplementary
distribution panel supports an additional 26 load feeds.
Both the initial (main) and supplementary distribution panels provide local
fuse and/or circuit breaker alarm indication by means of a red LED indicator.
In addition to providing protection and connecting points for the battery and
battery return cables for the loads, the initial distribution panel provides:
• a connecting point for the system’s main battery return reference (BRR)
cable
• connecting points for the bus bar links to bridge the supplementary
distribution panel, if provided
• connecting points for the bridge cables for a field-installed
supplementary rectifier shelf, if provided
• connecting points for the interface with the outside world (alarms inputs
and outputs, etc.)
• an LVD contactor inhibit switch
Battery enclosure for EMEA countries
For EMEA countries, if backup batteries are used, a battery enclosure is
required. Individual batteries are Hawker Energy SBS 60 Valve Regulated
Lead Acid (VRLA), 12 V DC nominal voltage, with a capacity of 50.8 Ah.
They are available in battery modules containing four batteries each
(A0669283 Battery Module). Install the modules in the N0003344 Battery










