User's Manual

IP Line administration using OTM 2.2 Page 639 of 910
IP Line Description, Installation and Maintenance
Figure 217
Scheduling an OM Report
3 Under Job, enter the Name and a Description for the scheduled OM
Report.
4 Under Run, select the radio button that indicates the frequency of report
generation.
5 Under Start at, enter the date and time of the start of the report period
using the Month, Day, Year, Hour, and Minute list boxes and the am or
pm radio buttons.
6 Under Start at, click the Late execution check box if the report is to run
at a later time if the system is busy at the scheduled time.
7 Click OK.
End of Procedure