Cell Phone - Mobile Phone User Manual
Table Of Contents
- toc
- New in this release
- How to get help
- Introduction
- Fundamentals
- Preinstallation
- Installation
- Postinstallation
- Overview
- MCG 3100 Web Console logon
- Procedure 2
- MCG 3100 parameter configuration
- Procedure 3
- License file
- Procedure 4
- Licence file troubleshooting
- Manage TLS certificates
- Enroll with a Certificate Authority
- Certificate Signing Request generation
- Procedure 5
- Example
- Sample CSR text
- Signed TLS certificate
- Procedure 6
- CA root and intermediate certificates
- Procedure 7
- Root and signed certificate installation
- Change the keystore default password
- CA root certificate distribution
- Procedure 10
- Procedure 11
- System software maintenance
- Appendix A Port numbers and protocols
- Appendix B Self-signed certificate generation

26 Installation
...
RPM installation complete. Please follow post
installation instructions.
The term postinstallation instructions refers to the postinstallation
configuration procedures. For more information, see
“Postinstallation” (page 27).
10 Remove the CD.
11 Proceed to postinstallation configuration.
OR
For a redundant server implementation, repeat Step 1 to Step
10 on the second server.
--End--
Nortel Mobile Communication 3100 Series Portfolio
Nortel Mobile Communication Gateway 3100 Installation and Upgrades
NN42030-300 02.03 Standard
9 May 2008
Copyright © 2007, 2008 Nortel Networks
.










