
Installing the Versalar 15000
308684-B Rev 00
2-11
To ensure proper ventilation, make sure that there is at least 4 in. (10.16 cm) of
space between the platforms. Figure 2-3 shows three DC power-based platforms
as well as two AC power-based platforms installed in four-post racks.