Server User's Manual

Preparing for installation Standard 1.0
30 CallPilot
5 Save all packing materials and cartons in case you must return any
equipment to the carrier.
What’s next?
Remove the server cover so that you can inspect the interior of the server.
See Removing the front bezel and server cover on page 31.