Use and Care Manual

INSTALLATION/OPERATION
IMPORTANT!!! PLEASE READ BEFORE INSTALLATION
If the unit has recently been transported, please let unit stand still for
a minimum of 24 hours before plugging it in.
Make sure that the unit drops down to desired temperature before loading
the unit with product.
Maker sure that there is proper ventilation around the unit in the area where
it will operate.
Make sure all accessories are installed (i.e. poly pans, drawers, casters)
before plugging the unit in.
Please read through the Operation / Owners Manual in its entirety.
UNCRATING
TOOLS REQUIRED
• Adjustable Wrench
• Phillips Screwdriver
• Level
The following procedure is recommended for uncrating the unit:
A. Remove the outer packaging, (cardboard and bubbles or Styrofoam corners
and clear plastic). Inspect for concealed damage. Again, immediately file a
claim with the freight carrier if there is damage.
B. Move your unit as close to the final location as possible before removing the
wooden skid.
CABINET LOCATION GUIDELINES
Install the unit on strong and leveled surfaces
unit may make unpleasant noises if surface is uneven
unit may malfunction if surface is uneven
Install the unit in an indoor, well-ventilated area
unit performs more efficiently in a well-ventilated area
for best performance, please maintain clearance of 3” on the back of the
unit
outdoor use may cause decreased efficiency and damage to the unit
Avoid installation in a high humidity and/or dusty area
humidity could cause unit to rust and decrease efficiency of the unit
dust collected on condenser coil will cause unit to malfunction. Clean the
condenser at least once a month with a brush or clean cloth
malfunction due to dirty condenser will void warranty