Instructions / Assembly
Table Of Contents
3
Installation Drawings & Dimensions
3/4" MPT
adapter
req'd to
adapt to
FPT inlet
3/4" pipe or
3/4" I.D. flexible
connector
Water
Supply
Floor Line
Install – Min.–
3/4" full flow
ball valve
w/ 3/4" FPT
inlet connection
(Valve not incl'd)
2'- 8" Min. — 5'- 0" A.F.F.
Installation Height
3" Min.
Removal
Clearance
NOTE:
Do not mount filter assembly
behind appliances that would
impede access for maintenance
of the treatment system
Provide appropriate
piping for treated water
to equipment
Max Pressure: 90psi
Max Temperature: 100ºF
Wall
1'- 9 7/8"
3 1/2"
5 1/8"
2 7/8"
to inlet
Water filtration unit
must be installed on the
cold water supply only
Mounted to
secure wall
on studs or
wall panel –
Do not mount
to unsupported
sheet-rock
or gypsum board.
3/4" Full flow
ball valve inlet
connection to
water supply
Installation with Recirculation System
NOTE: H2FLOW must be installed on the cold water supply only.
If the system uses a recirculation pump, install the H2FLOW
on the cold water line prior to the check valve as illustrated
in the example on the left.
3/4" pipe or
3/4" I.D. flexible
connector