Owner's manual

System Configuration and Setup 4-23
4.3.10.2 Default Post Run Park Location
Default Post Run Park Location allows you to designate a location for the dispensing head to wait
between program runs. Choosing an appropriate park location can greatly increase throughput.
To set up the default post run park location:
1. In the Main Window, select
Configuration > Setup Runtime Preferences > Default Post
Run Park Location
.
The Post Run Park Location window (Figure 4-17) opens.
2. Select the desired options.
3. Click on
OK.
Command Description
Enable Move to
Park Location
If checked, the dispensing head will move to the park location between
program runs.
Move to First Fid
Location
Moves the camera to the location of the first program fiducial to await the next
board or part.
Move to System
Location
Allows you to designate a system location (Purge Station, Weigh Station, etc.)
where the dispensing head waits for the next workpiece.
Location
Works in conjunction with Move to System Location. Choose a location by
clicking on the arrow and selecting from the list.
Set Active Valve
Designates the valve that will be active at program start on a dispensing
system configured with dual valves.
Figure 4-17 Post Run Park Location Window