Owner's manual
Running Production 8-5
NOTE In this example Valve Offsets is the selected initial setup procedure. Refer to
4.3.8 Machine Offsets for instructions on selecting an initial setup procedure.
15. Press
Done to run Valve Offsets.
The Setup Valve Offsets screen (Figure 8-4) opens.
Refer to 4.5.1 Valve Offsets for step-by-step instructions on performing a Valve
Offsets routine.
Figure 8-4 Original Prompted Setup - Valve Offsets
8.4.1 Scripted Prompted Setup
Scripted Prompted Setup is similar to the original Prompted Setup procedure, however you have the
option of selecting a script file at the beginning of a prompted setup. The script file customizes the setup
procedure to your particular dispensing system.
NOTE Century and M-600 Series Dispensing Systems support the original Prompted Setup
routine, as well as Scripted Prompted Setup. M-2000, X-1000, and Spectrum Series
Dispensing Systems support only Scripted Prompted Setup.