Owner's manual
7-28 Advanced Programming
Figure 7-14 M-Pass Program
92. From the Run menu, select Dry Run.
93. Make certain that the program executes the following steps correctly:
a. Finds two corner fiducials on the workpiece.
b. Finds the fiducials at each flip chip model location for the
U-pass pattern.
c. Perform a Flow Rate measurement. (Only performed on a wet run.)
d. Performs a substrate height measurement.
e. Dry dispenses two lines around each of the flip chip models.
f. Waits for the timer to expire, then dry dispenses a single U-shaped line around each of
the flip chip models.