User Manual
9-20 Advanced Programming
89. From the Run
RunRun
Run menu, select Dry Run
Dry RunDry Run
Dry Run.
> Make certain that the program executes the following steps correctly:
· Finds two corner fiducials on the workpiece.
· Finds the fiducials at each flip chip model location for the U-pass
pattern.
· Perform a Flow Rate measurement. (Only performed on Wet Run.)
· Performs a substrate height measurement.
· Dry dispenses two lines around each of the four flip chip models.
· Waits for the timer to expire, then dry dispenses a single U-shaped line
around the four flip chip models.
90. When satisfied that the program executes correctly, select Wet Run
Wet RunWet Run
Wet Run from the Run
RunRun
Run
menu.
This concludes the tutorial on a U-shaped Multipass Workpiece.