Instruction Manual

Installation 11
20. Use the front panel controls or the Fluidmove position controls to slowly move the dispensing
head around the dispensing area in the X, Y and Z axes, making sure that the pump can go
low enough to dispense and high enough to avoid hitting any obstacles.
! Adjust the height of the pump assembly within the Z-head slot, if necessary.
21. Configure the Fluidmove software as described in “Software Configuration” later in
this section.
Figure 2-5 Valve Cable and Hose Connections (M-600/Century Series)
To install the DP-3000 with Quick-Release Bracket on an M-2000 or an Axiom X-1020 Series
Dispensing System:
" NOTE This procedure is for initial installation only.
1. Remove the currently installed fluid dispensing pump and bracket assembly.
! Refer to the installation/removal procedures in the manual for the currently
installed pump.
" NOTE If your system has a Dual-Action Dispensing Head, the DP-3000
MUST be installed as Valve 2 when using two pumps. It will NOT function as Valve 1
due to the placement of the Height Sensor.
2. Use the Phillips-head screwdriver to loosen the screws on the Height Sensor bracket, and
remove the Height Sensor from the old bracket.
! If the Height Sensor includes a bracket spacer, remove the bracket spacer.
3. Position the dovetail receiver assembly onto the Z-head mounting plate. See Figure 2-6.
Syringe Receiver
Head Hose (Clear)
Valve Pressure
Hose (Blue)
Stopcock Pressure
Hose (Black)
DP-3000 Power
Cable