Instruction Manual
Running the VAPR Procedure 7
5. Click on Prompted Setup.
The Prompted Setup Window opens (Figure 2-6).
Figure 2-6 Prompted Setup
6. Verify that the "_Machine Offsets DJ Line" script file is selected.
The current script file is displayed at the top of the window.
7. If not, click on Select File and select it from the list.
8. Click on Run to End.
Fluidmove will prompt you through the setup task list.
Tasks are executed in the order listed.
A check mark will appear next to a task when it is finished.
9. When the Prime Valve task begins, the Vacuum Assisted Prime Window (Figure 2-7) opens.
Perform the following steps:
a. Set "Move to" position to 1.5 mm (0.06 in.).
b. Set "Start Vacuum for" to 2 sec.
c. Set Prime for" to 15 sec.
d. Set "Turn on Fluid Pressure after Jet has been on for" to 5 sec.
e. Click on Prime.