Instruction Manual
6 Running the VAPR Procedure
2.3 Running the VAPR Procedure
The VAPR procedure can be run automatically as part of the valve offsets routine or manually from the
Fluidmove Programming Window or Fluidmove Production Window.
NOTE VAPR must be run on a clean valve with a new feed tube. Once fluid has been
introduced into the valve VAPR cannot be used.
2.3.1 Automatic Operation
NOTE Make sure that "_Machine Offsets DJ Line.pss" is the selected script file. Refer to Step 9
under 2.2 Fluidmove Configuration.
2.3.1.1 Fluidmove Production Window
1. Install a clean valve with a new feed tube and fluid syringe onto the dispensing system.
2. In the Fluidmove Main Window, click on Run a Program.
The Fluidmove Production Window opens.
3. Click on Setup
4. Click on Setup Scripts.
The Run Script Window opens (Figure 2-5).
Figure 2-5 Fluidmove Production Window – Run Script