Power-up and Testing 5-1
5 Power-up and Testing
5.1 Overview
Once you have performed all of the procedures described in Section 4 - Installation, you are ready to
power-up the dispensing system. This section describes the power-up and testing procedures for making
sure that all system components are functioning and communicating properly. This section covers the
following topics:
Powering Up the System Robot (Dispensing Head) Function
Starting Easy Coat for Windows (ECXP) Conveyor Panel/Mechanics (C-740)
Robot/Conveyor I/O Dispensing System Options
Pneumatics
5.2 Safety First
Before operating the dispensing system, please review the information presented in Section 2 - Safety.
5.3 Powering Up the System
To power on the dispensing system:
1. Verify that the main power cord is connected to the Main Power Inlet and the facility
power source.
2. Verify that the facility air hose is connected to the Main Air Inlet (
Figure 5-1).
3. Verify that the Facility Exhaust Ventilation System ductwork is connected to the Exhaust
Vent Duct (
Figure 5-1).
" NOTE Refer to “Connecting Power and Air Supply” in Section 4 - Installation for
connection instructions for Steps 1-3 above.
4. Turn the Main Circuit Breaker to the ON
(I) position.