Instruction Manual

9-12 Maintenance
Tools and Materials Needed
Torque Wrench (P/N 199447)
Allen Wrench 9/64
CAUTION! The Robot will move during the tensioning process. Keep clear of the Robot
during the movements. Enter the dispensing area only when prompted to do so.
To tension the cables:
1. Perform a system startup as described in 6.9.1 Startup.
2. Depressurize Fluid System by turning off air pressure to Fluid Reservoir.
3. Remove the right side cover of the machine.
Item Description
1 Right Access Panel
Figure 9-6 System Access (Rear View)
4. Load ECXP and select Edit > Edit Mode to open the ECXP Edit Screen.
5. Click on
Utilities > Robot Utilities > Tension Procedure.
! The C74X Tension Procedure opens (
Figure 9-7).
1