Instruction Manual
Maintenance 9-11
9.5.7 Tensioning the Cables
Periodic tensioning of the C-740/C-741 mechanical drive cables can prevent premature failure of the
cables. For dispensing systems operating in a 24/7 production environment, tension the mechanical drive
cables approximately every six months. For systems operating in a single-shift environment (eight hours a
day or less), this should be done once a year.
To ensure that required maintenance is done on schedule, programmers can set up a tension reminder in
the EXCP Maintenance Manager. The Maintenance Manager displays a reminder for the operator the next
time production is started after the expiration of the configured time period. The operator can choose to
continue production without running the appropriate maintenance program, but the reminder will continue
to appear each time production is started until the maintenance program is run.
To set the cable tension reminder:
1. Click on
Configure > Maintenance Manager to open the Maintenance Manager dialog box.
2. Select
Cable Tension Reminder from the drop down list.
3. Select the desired unit.
4. Enter the time period.
5. Click
OK.
ECXP Maintenance Manager Dialog Box
CAUTION! This procedure should only be performed by a trained service technician.