Instruction Manual

6-28 Operation
6.10.3 Performing a System Test
Once the coating program has been developed, a system test should be performed. The following is a
typical series of steps required to perform a system test.
1. Fill the system with material to test coat a small production run.
2. Following the instructions in 6.11 Loading a Program and 6.12 Running a Program to start
your dispensing program.
" NOTE When running your program from the Edit Screen, you may click the Step button
instead of the
Run button to step through the loaded program. Each click on the Step
button performs one instruction. You may also click
Pause or Stop anytime
during program execution to stop or pause the program.
3. If the test is not acceptable, change variables and retest the production run.
4. When the program is acceptable, document the information in your production planning log.
Figure 6-11 Setup Flow Chart
Characterization
Choose
Material Type
Select Nozzle,
Temperature,
Viscosity,
Pressure
Run
Characterization
Define Board
Coating
Requirements
Develop
Coating
Program
Update or
Change
Test Coat
Board
Start ECXP
and load
Dispensing
Program
Test
Production
Run
Print Out
Program and
Make Backup
Diskette
Map Program
for Operator
Access
Document
Information in
Production Log
Ready for
Production
Coating Program
System Test