Instruction Manual
Operation 6-23
6.9 System Startup/Shutdown
This subsection details basic start-up and shutdown procedures based on different levels of operation. The
following procedures are offered as general recommendations and suggestions when starting and/or
shutting down your Century C-740/C-741 Series Dispensing System. Your actual start-up and shutdown
procedures may vary.
WARNING! Only authorized service technicians or process engineers should connect power
cables to the power source. Operators should not attempt to make electrical
connections.
6.9.1 Startup
If necessary, refer to the figures in Section 1 - Introduction to identify system components.
"NOTE If you are running a program from a disk, it is recommended that you first run a virus
scan on the disk before downloading anything from the disk to the Computer hard drive.
To start the dispensing system:
1. Verify that the Safety Interlock Keyswitch is in the ON (
I) position for production.
2. Close the dispensing system front doors and access covers.
3. Power on the dispensing system as described in 5.3 Powering Up the System.
" NOTE Ensure that all items on the Daily Routine Checklist have been completed prior to starting
the production run. Refer to 6.9.3 Daily Routine Procedures.
To Start ECXP:
1. Start ECXP as described in 5.4 Starting Easy Coat for Windows.
2. Refer to 6.10 Conformal Coating Setup Procedures, 6.11 Loading a Program and
6.12 Running a Program for detailed instructions on system setup and running production.