Manual

18-2 Index
light beacon, 2-7
light curtain, 2-7, 4-17
light ring, 9-5, 9-14
light ring card, 9-2
light, interior, 2-7
locking out power, 3-11
low air pressure sensor, 2-12
M
main air inlet, 2-12
main air pressure, 4-25
adjusting, 4-25
gauge and regulator, 2-12
main power cable, 2-12
main power switch, 2-12, 4-9
maintenance
conveyor, 7-6
system, 7-2
manual conventions, iii
manuals
supplied, 1-1
when to use, 1-2
N
noise, 8-2
O
operation
AV-700, 9-3
computer, 4-7
detailed, 4-2
height sensor, 10-12
theory of, 4-1
operator startup. See production startup
P
part sensors, 4-22
checking, 6-6
identifying, 7-7
pattern recognition, 9-1, 9-10
PAUSE button, 4-10
pneumatic lines, 4-26
power, 8-2
power switch, 2-7, 4-9
power switches, 4-9
Pre-dispense Zone, 4-22
production
shutdown, 5-5
startup, 5-3
purge boot, 7-4
PURGE button, 4-14
purge station, 2-7
R
rear view
features, 2-12
regulators, 4-24
S
safety interlock system, 2-7
colors, 4-16
light curtain, 4-17
safety precautions
earthquake, 3-12
electrical power, 3-10
lifting, 3-13
lockout, 3-11
operator, 3-1
system, 3-2
warning labels, 3-3
sensors
checking, 6-6
height, 2-7
identifying, 7-7
low air pressure, 2-12
service panel, 2-12
shipping weight, 8-2
shroud, 2-12, 2-13
shutdown
emergency, 3-8
production, 5-5
Solvent Cup, 16-6
Special Options
Hour Meter, 16-5
START button, 4-10
startup, 5-1
production, 5-3
STOP button, 4-10
stop pins, 4-22
substrate height, 9-8
supplies
cleaning, 4-36
System Specifications, 8-1
System Status, 4-13
System Status Reset, 4-13
T
t-bar regulator, 4-25
TEACH button, 4-11
temperature controller, 2-7
testing
I/Os, 16-4
theory of operation, 4-1
troubleshooting
AV-2550, 9-12
conveyor, 6-5
troubleshooting height sensor, 10-13
V
valve OFF, 4-26
valve ON, 4-26
valve pressure
adjusting, 4-31
gauge and regulator, 2-7
VALVE RESET, 4-14
valve status indicators, 4-14
video card, 9-2
vision system, 2-8, 9-14
adjusting brightness, 9-5
adjusting focus, 9-5