User guide
5-2 Startup/Shutdown
?
NOTE Steps 11 through 15 must be performed on the first startup after initial installation, or
after any hardware changes (including changing the needle/nozzle or removing the fluid
pump for cleaning). If you are sure that no hardware changes have occurred since your
last programming session, skip step 11, and steps 1-4 below. Continue with steps 5
through 7.
11. Run the machine offsets routine appropriate for your specific application (see the Machine
Offsets Procedures section below).
> If you have any questions, consult the Fluidmove for Windows NT User Guide or Online
Help.
In the FmNT Main Window:
1. Click on
Run a Program to run a production program. This brings up the Production Window.
2. In the Production Window, click on
Load.
3. Select the program you wish to run.
4. Click on
OK. This loads the production program into memory,
5. Click on
Run.
6. Select
Run Production. This brings up the Run Window.
7. Click on
GO. This activates the dispensing process.
> See the Fluidmove for Windows NT User Guide or Online Help for further instructions.