User Manual

13-6 Dual-Action Dispensing Head
Setup Using FmNT Tools
Only an Asymtek Field Service Engineer or an FmNT-experienced process programmer
should attempt to perform the setup procedure.
?
NOTE
These instructions do not discuss all configurable options in FmNT
Tools. Contact Asymtek Technical Support for more complete
information.
To setup the system in FmNT Tools:
1. Select FmNT – Tools from the FmNT Program Group.
2. Select Service Mode from the Log On Dialog Box.
3. Enter your password.
4. Choose OK.
5. Select System Configuration from the Configuration Wizard.
6. Enter the following in System Configuration
Interface Module: Century
Number of Valves: 2
Dual Action Valve: YES
Valve 1: DV06, DV6000, or DV01
Valve 2: DP2000
Low Fluid Sensor: none
Needle Finder: NS
Scale: none
Heater: none
Conveyer: none
7. Choose OK.