Manual
Start-up/Shutdown 5-3
Operator Start Up in FMDOS
Start up after a production shutdown:
1.
Press the Main Power Switch on the back of the Century Series system to
ON
( ).
2.
Press the Power Switch on the Control Panel to ON ( ).
3.
Choose whether you will run your program from Download or from an attached
computer and perform either Steps 4–5, or Steps 6–9.
4.
To Download a program, select the program using
Program
on the Control Panel.
5.
Press
START
to begin the dispensing program.
6.
To run a program from an attached computer, start FMDOS.
7.
Select .
8.
Select from the Editing Main Program
menu.
9.
Enter the number of cycles for the program to run.
Service Start Up in FMDOS or FMW
Use this procedure to turn ON the system after a service or maintenance procedure has been
performed. This procedure is for service technicians only.
1.
Reconnect the Main Power Cord from the Main Power Inlet if it was disconnected
for servicing.
2.
Reconnect the Main Air In if it was disconnected.
3.
Press the Main Power Switch on the back of the Century Series system to ON
(
)
.
4.
Press the Power Switch on the Control Panel to ON
(
)
.
5.
Press
SYSTEM RESET
on the Control Panel
.
a.
For FMDOS:
Perform either Steps 4 and 5 or Steps 6–9 under Operator Start Up in
FMDOS.
b.
For FMW:
Perform Steps 3–12 under Operator Start Up in FMW.