Owner manual

Installation 3-1
3 Installation
Overview
This section describes installation procedures for the Century Series C-341 Dispensing System and covers
the following topics:
Facility Requirements Electrical Connections
Uncrating and Placing the Dispensing System Exhaust Connection
Component Installation Connecting Power and Air Supply
Pneumatic Connections ECNT Configuration
Safety First
Before performing any of the system installation procedures in this section, please review the information
presented in the Safety section.
Facility Requirements
To ensure optimal performance and safety, it is necessary to install the dispensing system in a facility that
meets or exceeds the requirements listed in the Specifications section. If you have any questions about
facility requirements, please contact Asymtek Technical Support.
WARNING! Make sure that your facility meets all requirements listed the Specifications
section. Failure to meet these requirements could result in serious bodily injury to
personnel and damage to the dispensing system.
CAUTION! If the dispensing system is being installed in a clean room, uncrate the system,
unpack the accessories crate, and remove all packaging material including
wrapping paper and tape from all parts and components before moving anything
into the clean room.