Installation Manual

Power-up and Testing 5-23
11. Disconnect the syringe receiver heads from the blue and black fittings on the
Valve 1 pneumatic Bulkhead.
12. If previously disconnected, reconnect all air hoses to the Dispensing Valve.
13. Repeat Steps 1 through 10 for the Valve 2 (
V2_FLUID, V2_VALVE) pneumatic lines and the
Dual Action pneumatic lines (
DUAL_ACTION_AIR), if applicable to your configuration.
> The Valve 2 pneumatic Bulkhead is located on the right-hand side of the
Dispensing Head.
14. Close the Dispenser I/O Test dialog box to return to the Tools Window.
Conveyor and Conveyor Pneumatics
Perform the following procedures, as applicable to your system configuration, to check function of the
Conveyor and its associated components.
To check adjustable-width Conveyor clearance, Safety Interlock, and X- and Y-axis movement:
CAUTION! Perform this procedure only if your dispensing system has been configured for an
application that requires an adjustable Conveyor width. DO NOT perform the
procedure for fixed-width Conveyor configurations.
? NOTE This procedure assumes that you are already in the FmNT Tools Window. If not, refer to
the first two steps in the Needle Sensor test procedure.
1. Verify electrical cables and pneumatic lines near the Conveyor are not in danger of being
pinched or snagged during Conveyor operation.
2. In the FmNT Tools Window, click on the
Jog icon .
3. In the Jog Commands dialog box, click on
Conveyor. See Figure 5-14.
4. Click on
Home in the Jog Commands dialog box and make sure that the rear Conveyor Rail
moves to the home position at the rear of the dispensing system.
> The rear Conveyor Rail should start moving to the rear of the dispensing system.
> Rear Conveyor Rail movement should be smooth and not damage any electrical lines or
pneumatic hoses.
5. While the Conveyor Rail is moving, lift the Hatch.
> The green Beacon light should go OFF, the yellow Beacon light should come ON, and
the Conveyor Rail should stop moving.
6. Close the dispensing system Hatch.
> The yellow Beacon light should go OFF, the green Beacon light should come ON, and
the Conveyor Rail should continue moving to the Home position.