Installation Manual

5-8 Power-up and Testing
Component-Level Functional Tests
After initially powering up your dispensing system, all major subsystems must be tested to ensure that
they are ready for operation. Use the checklist in Appendix D to record completion of the following
functional tests:
Pneumatic Regulators and Gauges
Impingement Air Flowmeters
EMO Check on Main Interface PWA
Light Beacon
Dispensing Head and Accessories
Needle Sensor
Purge Station
Dispensing Valve Pneumatics
Conveyor and Conveyor Pneumatics
Leveling the Dispensing System
Lift Table and Heater Tooling Leveling
Heater Tooling and Needle Heaters
Vision System
Scale
Dispensing Calibration Module
CAUTION! The following procedures should only be performed by a trained
service technician.
Tools and Materials Needed
Production Sample Workpieces (3) 24-bit I/O Tester (P/N TS-03)
Multimeter Installation Checklist in Appendix D
3/4-inch Wrench Syringe Receiver Heads (2)
1-1/2-in. Wrench Small Box Level
1.5-mm Hex Key Calibrated Temperature Probe, Digital
Pen Removable Thread Locker (P/N 40-0019)
Metal Ruler