Installation Manual
5-8 Power-up and Testing
Component-Level Functional Tests
After initially powering up your dispensing system, all major subsystems must be tested to ensure that
they are ready for operation. Use the checklist in Appendix D to record completion of the following
functional tests:
• Pneumatic Regulators and Gauges
• Impingement Air Flowmeters
• EMO Check on Main Interface PWA
• Light Beacon
• Dispensing Head and Accessories
• Needle Sensor
• Purge Station
• Dispensing Valve Pneumatics
• Conveyor and Conveyor Pneumatics
• Leveling the Dispensing System
• Lift Table and Heater Tooling Leveling
• Heater Tooling and Needle Heaters
• Vision System
• Scale
• Dispensing Calibration Module
CAUTION! The following procedures should only be performed by a trained
service technician.
Tools and Materials Needed
• Production Sample Workpieces (3) • 24-bit I/O Tester (P/N TS-03)
• Multimeter • Installation Checklist in Appendix D
• 3/4-inch Wrench • Syringe Receiver Heads (2)
• 1-1/2-in. Wrench • Small Box Level
• 1.5-mm Hex Key • Calibrated Temperature Probe, Digital
• Pen • Removable Thread Locker (P/N 40-0019)
• Metal Ruler